PPFT 1020 Pipe Systems Installation and Assembly

Provides instruction of various pipe systems, interpret pipe layout diagrams, mathematical specifications for connections. Topics include: various pipe systems and materials; components and specifications for installation; blueprint drawings and detail sheets of specifications; valve installation and operations; mathematical precision for measurement and problem solving, and assembly requirements for threaded pipe fabrication. Labs will demonstrate proficient interpretation of blueprints, installation and assembly of pipe systems to include valve installation and threaded pipe fabrication while choosing appropriate materials for installation.

Credits

3

Prerequisite

Program Admission

Corequisite

COFC 1080 - Construction Trades Core

Lab Contact Hours

60

Lecture Contact Hours

15

Total Contact Hours

75